The Dust Impact Assessment prepared for this project by MWA Environmental also determined that with the appropriate dust controls and management measures, surrounding residences would not be exposed to dust above the levels prescribed in the Queensland Environmental Protection (Air) Policy 2008.
Barro Group has ensured that the location, layout and staging of this proposed development have to a large extent been predicated by consideration of environmental issues including dust.
The project will comply with DEHP noise and dust criteria.